Jet

Home

General

Bellows AFS

Hickam AFB

Kaala AFS

Kaena Pt. STS

Kokee AFS

Web Site Map

CH2M HILL/Honolulu's Current AFCEE Projects

General Information


This site includes links to general information related to AFCEE projects.

This document establishes the quality assurance/quality control (QA/QC) protocols and procedures that govern sampling and analytical activities for projects at 15 ABW installations. The current AFCEE QAPP Version is 4.0.01 (AFCEE, May 2005). The Installation-Wide QAPP (IWQAPP), Version 2.0, was finalized in November 2002 and meets the requirements of the AFCEE QAPP, Version 3.1 (AFCEE, August 2001). To meet the requirements of the AFCEE QAPP, Version 4.0.01, the Installation-Wide QAPP required an update. The update was developed as a programmatic document (as was the IWQAPP) to be used in conjunction with project specific QAPPs.

The report may also be downloaded in sections:

(656 KB)

      • Appendix A (Clarifications and Variances)
      • Appendix B (Additional Methods)
      • Appendix C (Data Management Plan)

 

This document—together with AFCEE's Guidance for Contract Deliverables, "Appendix C: AFCEE Quality Assurance Project Plan" (QAPP), Version 3.1" (August 2001)—establishes the quality assurance/quality control (QA/QC) protocols and procedures that govern sampling and analytical activities for projects at 15 ABW installations. Unless otherwise noted in Project-Specific QAPP information, all field staff, contractors, and subcontractors will be expected to comply with the procedures specified in the IWQAPP and the IWFSP. This plan is used for CEVR projects.

This document—developed from AFCEE's Guidance for Contract Deliverables, "Appendix B: AFCEE Model Field Sampling Plan, Version 1.1" (March 1997)— presents the standard operating procedures and protocols for site characterization and sample collection and analysis at 15 ABW installations in Hawaii. Unless otherwise noted in Project-Specific FSPs, all field staff, contractors, and subcontractors will be expected to comply with the procedures specified in the IWFSP and the Installation-Wide Quality Assurance Project Plan to maintain the uniformity of project data. This plan is used for CEVR projects.

This document presents guidelines for contractor waste management guide at 647 CES installations. This plan is used for CEVR projects.

 


 

Please e-mail Web Master with your suggestions for improving this site.