CH2M HILL/Honolulu's Current AFCEE Projects
Kokee Air Force Station
This site includes descriptions of each current Kokee Air Force Station delivery order and links to some electronic documents.
DO92 -- NFRAP Decision Document Project, Multiple Installations (Back to Top)
Description of Delivery Order 92 (Back to Top)
- The objectives of the NFRAP Decision Document Project are:
- to finalize several draft documents completed by CH2M HILL and another contractor
- to collect soil and groundwater samples to determine if several sites can be designated as NFRAP sites
- to close several sites at 15th ABW installations on Oahu and Kauai as NFRAP by preparing closure documentation.
- This project includes several major tasks:
- Prepare Work Plan Documents for the project.
- Finalize several existing Preliminary Assessment/Site Inspection (PA/SI) reports produced by another contractor, including ERPIMS submittal of data collected.
- Finalize several NFRAP Decision Documents prepared by CH2M HILL for Hickam AFB, Bellows AFS, Kaena Point Satellite Tracking Station (STS), Palehua Solar Observatory, and Kokee AFS.
- Conduct a limited site inspection at sites at Hickam AFB, Kaala AFS, Kokee AFS, and prepare Site Inspection (SI) reports.
- Prepare several closure letters and NFRAP Decision Documents for sites at Hickam AFB, Bellows AFS, Kaena Point STS, Kaala AFS, Punamano AFS, and Kokee AFS.
Deliverables Related to Delivery Order 92 (Back to Top)
Please e-mail Jeanne Keuma with your suggestions for improving this site.
|