Reference Documents

Click to download
100% Drawings
Use the Drawings Index: Page 1; Page 2; Page 3 to find the applicable drawings on the Drawing FTP site
Link to Drawing FTP Site
100% Specifications
Use the Specification Contents to find the applicable specifications on the Specifications FTP site
Link to Specifications FTP Site
Standard Details
Use the Standard Details Index to find the applicable standard details on the Standard Details FTP site
Link to Standard Details FTP Site
Project Schedule
Project Schedule - Updated January 2007
Certified Payroll
Labor Compliance Program for San Diego County Water Authority
Appendix 18 Additional Labor Requirements
Certified Payroll Worksheet
Quality Management Plan
TWOV WTP and WCF Construction Tasks
Health, Safety and Insurance
(FSI) Field Safety Inspection (Site Specific Safety Manual)
  Attachments to FSI