Alignment Review
Presently, the alignments of all open channels and underground infrastructure within the project limits have been determined based on collaboration with City staff. For ease of review, the area covered by the Storm Water Master Plan has been subdivided into 23 sheets (each bordered by the yellow highlighted limits). Click on any red sheet number on the map below to review the sheet in more detail. The PDF map sheet will open in a separate browser window. The alignment of the open channels will be shown in bold red lines and the underground infrastructure will be shown in bold blue lines.
NOTE: Each PDF file may take several seconds to open depending on the speed of your internet connection. The comment period for the proposed channel and underground infrastructure alignments is now closed. For responses to public input, please click the Comments / Public Input link.
For additional information on how to use this Alignment Review page, click Learn More.

