Construction Photos

Jun '04 | Jan '04 | Dec '03 | Sept '03 | July '03 | June '03 | Mar '03 | Feb '03 | Jan '03
Dec '02 | Nov '02 | Oct '02 | Sept '02 | Aug '02 | Late Jul '02 | Mid-Jul '02

June '04


UV Building Completed


Operations Building Completed


Ozone Building Completed

January '04


UV Building


Operations Building


Ozone Building


Wetland Mitigation

December '03


UV Building


South Clearwell, both clearwells completed


Intake Structure Completed


Operations Building


Flow Control Facility 5


Tree Planting

September '03


UV Building


North Clearwell


Intake Structure


Operations Building


Flow Control Facility

July '03

Post-tensioning ...

Masonry work started ...

Three quarters of the ...

The raw water pipes ...

Setting blocks for the ...

Flow Control Facility ...

June '03

All of the concrete ...

Most of the exterior ...

A special scaffolding ...

Raw water pipes and ...

Masonry work ...

Excavation started ...

March '03

Construction of the ...

Following the shoring ...

Crew members are ...

The pump platform ...

The crew member in ...

Installation of pipes ...

February '03

The construction crew ...

Work continued on ...

Plastic sheeting is ...

Inlet piping has been ...

Another view of the ...

These tanks will hold ...

January '03

Forming the walls ...

Continued success ...

Formation of the ...

The final quarter slab ...

One of the benefits ...

December '02

Construction of the ...

Work on the UV ...

Work on the UV ...

The raw water intake ...

November '02

Pile driving for the ...

The walls of the ...

Construction of the ...

Pipes continue to ...

The pipes are ...

October

One of the pipes that ...

Concrete has been ...

The foundation for ...

Portions of the raw ...

This detention pond ...

Construction of the ...

September '02

This excavation is for ...

A vibratory hammer ...

Water is drawn from ...

Preliminary work for ...

These structures ...

August '02

Now that clearing and...

Construction at the...

Following installation...

A ductile iron pipe...

A pipeline has been...

Erosion control fences...

Late July '02

A silt fence has been installed...

The site of the south water tank...

This area has been cleared...

This is a temporary sediment pond...

This is the backside of the sediment pond...

Mid-July '02

Work crews have been...

Some cleared trees...

Woodchips are loaded...

Double silt fencing...

Trench for cut-off wall...