![]() |
Cedar River Pipeline construction, 19291,539 feet of 60-inch steel pipe were installed from the Control Works to connect Cedar River Pipeline No. 2. Because of the size of available equipment and resources, impact to the environment was extensive. Photo source: Seattle Municipal Archive Photograph Collection |