AFCEE HI Projects -- Wake Atoll
This site includes descriptions of each current wake Air Force
Station task order and may include links to some electronic
documents.
Remedial Investigation/Feasibility Study at Site OT10 (Peacock Point Burn Area No. 1), Wake Island Airfield, Wake Atoll (TO 114)
Remedial Investigation/Feasibility Study at Site ST32 (Runway Staging Area Underground Storage Tanks) and Decision Documents, Wake Island Airfield, Wake Atoll
(TO 163)
Wake Groundwater Evaluation, Wake Island Airfield, Wake Atoll (TO 205)
Remedial Investigation/Feasibility Study at Sites SD52 (Wetlands Battery Dumpsite) and OT12D (Installation Road System), Wake Island Airfield, Wake Atoll (TO 206)
Groundwater Study at Multiple IRP Sites, Wake Island Airfield, Wake Atoll (TO 454)
Interim Removal Actions, Various Sites, Wake Island Airfield, Wake Atoll (TO 509)
Additional Engineering Evaluation/Cost Analysis Data Collection, Wake Island Airfield, Wake Atoll (TO 553)
Wake Island Petroleum, Oil, and Lubricants Interim Removal Action, Various Sites, Wake Island Airfield, Wake Atoll
(Back to Top)
Deliverables Related to Task Orders 63, 237, and 326
(Back to Top)
-
Final 2009 Groundwater Monitoring Report for
Sites ST08 and ST09, Wake Island Airfield, Wake Atoll
(March 22, 2010)
Long-Term Monitoring Plan for Sites ST08 and ST09, Wake Island Airfield, Wake Atoll
(April 2010)
- Final
Updated Proposed Plan for No Further Action at Site ST01, Wake Island Airfield, Wake Atoll
(January 2010)
-
Technical Memorandum, Updated Human Health Risk Screening for Site ST01, Wake Island Airfield, Wake Atoll
(December 11, 2009)
- Final
No Further Response Action Planned, IRP Site SS21A, Wake Island Airfield, Wake Atoll
(November 2009)
- Final
No Further Response Action Planned, IRP Site ST31, Wake Island Airfield, Wake Atoll
(November 2009)
- Final
No Further Response Action Planned, IRP Site DA44, Wake Island Airfield, Wake Atoll
(November 2009)
- Draft
Work Plan, UST Investigations and Removals at Site ST32, Wake Island Airfield, Wake Atoll
(October 2009)
- Draft
No Further Response Action Planned, IRP Site TA54, Wake Island Airfield, Wake Atoll
(October 2009)
- Revised Final
Action Memorandum, Time Critical Removal Action, Site DA44, Wake Island Airfield, Wake Atoll
(October 2009)
- Final
Proposed Plan for Site ST01, Wake Island Airfield, Wake Atoll
(September 2009)
- Draft
Addendum to the Site ST01 EE/CA: Data Gap Ivestigation Results and Human Health Risk Screening Update
(June 2009)
- Draft
Addendum to the Site TA54 EE/CA: Data Gap Ivestigation Results and Human Health Risk Screening Update
(June 2009)
- Final
Wake POL Long-Term Management Work Plan, Wake Island Airfield, Wake Atoll
(January 2009)
- Final
Environmental Cleanup Plan, Wake Island POL Interim Removal Action, Wake Island Airfield, Wake Atoll
(September 2007)
Remedial Investigation/Feasibility Study at Site OT10 (Peacock Point Burn Area No. 1), Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 114
(Back to
Top)
Remedial Investigation/Feasibility Study at Site ST32 (Runway Staging Area Underground Storage Tanks),
Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 163
(Back to
Top)
- Final
Work Plan, RI/FS at Site ST32 (Runway Staging Area Underground Storage Tanks), Wake Island Airfield, Wake Atoll
(May 2010)
- Final
Proposed Plan for Site ID50 (Former LORAN Station), Wake Island Airfield, Wake Atoll
(May 2010)
- Final
Proposed Plan for Site ID57 (Asphalt Batching Plant/Spreader Site), Wake Island Airfield, Wake Atoll
(May 2010)
- Final
Proposed Plan for Site OT15 (Power Plant Fuel Oil Storage Area), Wake Island Airfield, Wake Atoll
(May 2010)
-
Record of Decision for Site ST01, Wake Island Airfield, Wake Atoll
(April 2010)
- Final
Proposed Plan for Site OT13 (Scrap Metal Pile No. 2 and Burn Area), Wake Island Airfield, Wake Atoll
(April 2010)
Wake Groundwater Evaluation, Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 205
(Back to
Top)
Remedial Investigation/Feasibility Study (RI/FS) at Sites SD52 (Wetlands Battery Dumpsite) and OT12D (Installation Road System), Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 206
(Back to
Top)
Groundwater Study at Multiple Installation Restoration Program (IRP) Sites, Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 454
(Back to
Top)
Other Contractor's Deliverables Related to Task Order 454
(Back to Top)
Interim Removal Actions, Various Sites, Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 509
(Back to
Top)
- Final
Action Memorandum for Site OT13, Wake Island Airfield, Wake Atoll
(April 2009)
- Final
Wake Action Memorandum Fact Sheet, Wake Island Airfield, Wake Atoll
(September 2007)
- Final
Action Memorandum for IRP Site ID50, Wake Island Airfield, Wake Atoll
(September 2007)
- Final
Action Memorandum for IRP Site ID57, Wake Island Airfield, Wake Atoll
(September 2007)
- Final
Action Memorandum for IRP Site OT12, Wake Island Airfield, Wake Atoll
(September 2007)
- Final
Action Memorandum for IRP Site SD52, Wake Island Airfield, Wake Atoll
(September 2007)
- Final
Strategic Sampling Plan for IRP Site OT13, Wake Island Airfield,
Wake Atoll
(September 2007)
Additional Engineering Evaluation/Cost Analysis Data Collection, Wake Island Airfield, Wake Atoll (Back to Top)
Deliverables Related to Task Order 553
(Back to
Top)
Please e-mail the Webmaster with
your suggestions for improving this site.
|