|
|
|
CH2M HILL/Honolulu's Current AFCEE Projects
General Information
This site includes links to general information related to AFCEE projects.
-
Environmental Restoration Program
Quality Assurance Project Plan (ERP QAPP) for Multiple Projects for the 15th Airlift Wing, Hickam Air Force Base, Oahu, Hawaii
(CH2M HILL, November 17, 2006). (3.4 MB)
This document establishes the quality assurance/quality control (QA/QC)
protocols and procedures that govern sampling and analytical activities for projects at
15 ABW installations. The current AFCEE QAPP Version is 4.0.01 (AFCEE, May 2005).
The Installation-Wide QAPP (IWQAPP), Version 2.0, was finalized in November 2002 and meets the requirements of the
AFCEE QAPP, Version 3.1 (AFCEE, August 2001). To meet the requirements of the AFCEE QAPP, Version 4.0.01,
the Installation-Wide QAPP required an update. The update was developed as a programmatic document
(as was the IWQAPP) to be used in conjunction with project specific QAPPs.
The report may also be downloaded in sections:
-
Installation-Wide Quality Assurance Project Plan for Multiple Projects at 15 ABW Installations
in Hawaii (IWQAPP), Version 2.0 (CH2M HILL, November 19, 2002).
(1.9 MB)
This document—together with
AFCEE's Guidance for Contract Deliverables,
"Appendix C: AFCEE Quality Assurance Project Plan" (QAPP), Version 3.1"
(August 2001)—establishes the quality assurance/quality control (QA/QC)
protocols and procedures that govern sampling and analytical activities for projects at
15 ABW installations. Unless otherwise noted in Project-Specific QAPP information,
all field staff, contractors, and subcontractors will be expected to comply with the
procedures specified in the IWQAPP and the IWFSP.
This plan is used for CEVR projects.
-
Draft Installation-Wide Field Sampling Plan for Multiple Projects at 15 ABW
Installations in Hawaii (IWFSP) Version 3.0 (CH2M HILL, July 12, 2002).
(1.3 MB)
This document—developed from
AFCEE's Guidance for Contract Deliverables,
"Appendix B: AFCEE Model Field Sampling Plan, Version 1.1" (March 1997)—
presents the standard operating procedures and protocols for site characterization and
sample collection and analysis at 15 ABW installations in Hawaii.
Unless otherwise noted in Project-Specific FSPs, all field staff, contractors, and
subcontractors will be expected to comply with the procedures specified in the IWFSP
and the Installation-Wide Quality Assurance Project Plan to maintain the uniformity of
project data. This plan is used for CEVR projects.
-
15th Airlift Wing Installation Restoration Program
Contractor Waste Management Guide (15 AW IRP CWMG)
(CH2M HILL, October 2009)(4.5 MB)
This document presents guidelines for contractor waste management guide
at 15th Airlift Wing installations. This plan is used for CEVR projects.
Please e-mail Web Master with your suggestions for improving this site.
|