Welcome (164 kb)

Purpose & Need (161 kb)

Project Schedule (170 kb)

Our Study Process (228 kb)

Lamar Travel Survey (236 kb)

Existing Traffic Conditions (592 kb)

Our Social Econamic Analysis Approach (257 kb)

Public Meeting #3 Presentaion (6.5 mb)


Proposed Interchange Alternatives

North

N1 Diamond with a Loop (361 kb)

N2 Diamond (359 kb)

N3 Tight Diamond (358 kb)

East

E1 Diamond (356 kb)

E2 Loop with Flyover (356 kb)

E3 Diamond with Flyover (356 kb)

South

S1 Northbound Left Exit (263 kb)

S2 Northbound Right Exit (261 kb)

S3 Partial Cloverleaf (262 kb)

S3B Partial Cloverleaf Shifted North (273 kb)

S4 Folded Diamond (271 kb)

S5 Half Diamond (271 kb)

 

[ CLOSE WINDOW ]